Friday, October 12, 2007

Facade installed


Here is the facade installed in the church.

Thursday, October 4, 2007

Facade pipes painted


Here are some the facade pipes after being painted. For having been through a tornado and 3 moves they are in remarkably good shape!

Monday, October 1, 2007

New facade chests stained

Here are the new windchests for the facade with their stain in place. The next step is to spray on several coats of laquer and then to buff out the finish.

Thursday, September 27, 2007

More Chests


This is one of two chests which go on each side of the large center chest. These are also curved to match the wall upon which they will stand.

Facade Chest

Here is the center raised section of the curved facade chest. Click on the picture for a larger version. The horizontal veneer and trim is all of Oak. The remainder of the construction is of cabinet grade birch plywood and solid spruce.

Saturday, September 15, 2007

Inside the Swell division

Here is the inside of the swell division with the bass chest at the lower right and the treble chest at the upper right.

The swell division is complete


Here is the completed swell division. Originally the swell division was spread out on one level. Now the treble chest is "double-decked" above the bass chest. The corner of the swell frame is cut off and will (theoretically) match the slope of the ceiling in the new organ chamber.