More Chests
This is one of two chests which go on each side of the large center chest. These are also curved to match the wall upon which they will stand.
Facade Chest
Saturday, September 15, 2007
Inside the Swell division
The swell division is complete
Thursday, September 13, 2007
Construction Begins
We have begun re-engineering this organ for installation into Valley Community Presbyterian. The picture shows the swell organ in its new configuration with its utilitarian swell enclosure. This division was originally all on one level but is now double-decked in order to fit in the new organ chamber.